IT Matters Fall 2013

3 10 2013

The Fall 2013 issue of IT Matters is out. Highlights for faculty members:

  • Plans for the transition from Angel to Desire2Learn (p. 1, 11)
  • Wireless in outdoor spaces (p. 2)
  • CIO Jerry DeSanto on budget concerns and the BYOD – Bring Your Own Device – strategy (p. 3)
  • Thin client computers in computer labs (p. 4)
  • Windows XP end-of-life (p. 4)
  • R Number logins for desktop computers (p. 4)
  • Office 365 (p. 5)
  • IR Project Pipeline (p. 8)
  • Panopto lecture capture pilot (p. 12)
  • Classroom upgrades (p. 12)




Wireless Network work this week

5 08 2013

Update 2013-08-08: Downtime complete :)

[Updated 2013-08-05]

Network Infrastructure is going to be working on our wireless network this week, upgrading to a new version of Cisco NAC. If you’ll be working on campus this week, you may see some downtime on Tuesday and Thursday in the late afternoon/early evening. Notice from the downtime-notices RoyalList:

What:
Network Infrastructure will be upgrading Cisco NAC to version 4.9.3.

Why:
To add support for newer operating systems and antivirus as well as add new features. During this upgrade we will also be migrating off of legacy hardware onto new appliances.

When:
August 6th 4:30 PM – 6:30 PM
August 7th 4:30 PM – 8:30 PM

Impact:
August 6th 4:30PM – 6:30 PM:
Approximately 20 mins of downtime is expected for the wireless network.  Wired connections will be unaffected.
August 7th 4:30PM – 6:30 PM:
There will a 1 hour window of downtime where wireless (Royalair, RoyalGuest) and unauthenticated users on wired connections on campus will be unable to login.





TAG Summer Synopsis

29 08 2012

Welcome back, all! In case you didn’t spend your summer break thinking about campus technology, here’s a quick recap of what’s been going on over the past few months and what we’ll be talking about in fall semester.

What Happened:

  • Campus wireless upgrade. We’re seeing huge improvements in connection speed and strength – thank you, Network Infrastructure!
  • Classroom upgrades. Over the summer, IT Services remediated all of Brennan’s teaching spaces. Other classrooms were upgraded as well – including CLP223, 224, 225, JOH 150, 152, MGH 017, 209, 336, 402, and 406.
  • Lecture Capture. Lecture capture capability has been installed in LSC133 and LSC333. TAG members Jeremy Sepinsky and Tara Fay are doing pilot projects this fall to test out the new technology before extending it to other classrooms. Nursing and Counseling departments are next on the list.
  • Mobile access to Angel. We now have a license for Blackboard Mobile Learn for Angel, so you can download the free app for use on your iPhone, iPad, Android, or Blackberry device.
  • R-ID authentication. Instructor stations and computer labs now require your R number as your user name. Your password is the same.
  • Virtual desktops. 203 computers in Brennan and Library computer labs are now thin client machines.  At these terminals, students access virtual desktops and save files to SkyDrive.

What’s Coming:

  • Standard user accounts. As Windows 7 is rolled out for new faculty computers, our roles will change from administrative to standard user accounts. This is a security measure to try to prevent users from downloading and installing malicious software. By default, standard users can’t install or delete applications. This would be a major issue for many faculty members, but IR has been working on a solution for faculty, using Viewfinity privilege management software. The plan so far: when you need to install an application, you’re prompted to enter a brief description/justification, and then your permissions are temporarily elevated so that you can install what you need. Commonly used software is whitelisted to speed things up. I’ve been piloting it this summer from a faculty perspective, with good results. Mac and Linux users will not be affected. More details on this later.
  • Code of Responsible Computing. This policy is up for review. As a representative from TAG and the Faculty Senate, Dave Dzurec has bravely agreed to co-chair the effort. We’ll post updates here.
  • The academic server is scheduled for final retirement this year. Several faculty members still have web content on the server – so CTLE (probably with some help from TAG) will be reaching out to those folks this semester to help them move any content they want to keep.
  • Luminis upgrade. An update to the my.scranton portal is currently scheduled for December 2012. TAG is contributing suggestions for the new faculty tab – let me know if you’re interested in giving ideas or feedback.
  • Software licensing for virtualized environments.  The idea is that faculty, staff, and students could log into their virtual desktop from any computer and access the specialized software they need (SPSS, etc). Unfortunately, this is really expensive. IR is looking into it.
  • Royal Card. The system will get a full upgrade this year. This won’t have much effect on faculty from what we can tell.

What’s Stalled:

  • Academic Technology Plan. Sigh. That said, TAG is still looking for faculty input on future technology needs. What kind of teaching spaces do we want? What technology funding is most important? We’re hoping to get more conversations started on these topics this year.

 

——————
*Thanks to Jim Franceschelli, Lorraine Mancuso, Jerry DeSanto, and Robyn Dickinson for talking us through this year’s road map.

**IR staff, please let me know if I got anything wrong. Thank you!





TechQual Survey Results

8 12 2011

Last month, members of TAG met with representatives from IR’s Office of Planning & Institutional Effectiveness to discuss results from the TechQual survey that faculty were asked to fill out over the summer.

At this point, IR is working through the results and meeting with focus groups to get a deeper understanding of what the results mean for planning and operations.  IR will not be sharing the full results directly with the University community, but the next IT Matters newsletter will include evaluation and reflection on the survey results as a whole.

During the TAG focus group, we looked specifically at faculty responses to the survey.  Only full-time faculty were included in the survey, and there was a 21% response rate.  This is the second time TechQual has been administered on campus – it was first administered in 2008.  The survey respondents were split differently in 2008 than in 2011, so IR is not able to compare the answers directly, but there is some indication of changes over time.

The TechQual survey looks at three major areas: Connectivity & Access, Technology & Technology Services, and End User Experience. The survey instrument asks respondents to rate each item in three ways: in terms of 1) minimum service level, 2) desired service level, and 3) perceived service level.

Overall, the survey results indicate that for faculty, IR is not meeting mean desired expectations. In some areas, IR is not meeting mean minimum expectations.  Adequacy gaps, or the difference between minimum and perceived performance, were larger for faculty respondents than for staff.  There was evidence that faculty user experiences varied significantly, with some responses being overwhelmingly positive while others were negative.

Although direct comparisons could not be made to the 2008 survey data, there was a trend of rising user expectations for minimum service levels. At the same time, users’ perceived service levels were generally about equal or slightly higher, suggesting that IR is holding steady or improving in some areas.

The good news is that some of the key areas identified for improvement have already been addressed or will soon be addressed. For example, faculty respondents’ perceived level of service for wireless connectivity was below their reported minimum levels of service, but the campus wireless network is scheduled (pending the approval of funding) to undergo additional upgrades that will significantly improve connectivity in academic and administrative buildings.

Classroom technology had the largest adequacy gap for faculty respondents. We spent some time discussing what kind of classroom technology needs faculty experience.  Most campus spaces are designed either for using technology (e.g., all seats face a display screen; projection screen requires dimming lights) or for not using technology (e.g., seminar-style seating). TAG members asked for classroom environments that allowed spontaneity and collaboration.  We also discussed how faculty and IR can best communicate about technology problems in classrooms (e.g., if a broken projector is reported, can the instructors of the next scheduled classes be notified?). Jim is currently working with OIT and the Technology Support Center staff to figure out solutions to these kinds of questions.

On a more TAG-specific note, in the End User Experience portion of the survey, faculty respondents noted that for “Opportunities to Provide Feedback” their perceived service level was approximately equal to their minimum service level. This result suggests that TAG needs to continue to raise our profile as a communication channel between faculty and IR.

We ran out of time to fully discuss all of the faculty results, but other areas identified for improvement included mobile access and the website/my.scranton portal – aspects of which are currently being addressed by IR teams with faculty representation (the Mobile Apps Work Group and the Luminis Work Group).

[My notes on this meeting were a little rough, so if anyone notices errors or omissions, please let me know and I’ll correct it ASAP! – KY]





TAG Meeting Notes 9/29/11

29 09 2011

We had our first TAG meeting of 2011-2012 this morning.  We had a lot to catch up on from the summer, so apologies for the long notes! As always, post a comment if there are any questions or concerns.

  • New members. Teresa Conte joined us from Nursing as a replacement for Cathy Lovecchio. Ben Bishop (Computing Sciences) joined us late last spring, as did Lori Nidoh (representing Public Relations). S.P. Chattopadhyay is currently on sabbatical, and Kevin Wilkerson has returned from his.
  • Novel Pedagogy Cohort. Jeremy and a few other CAS faculty members have formed a small group to explore and implement new pedagogy techniques in their classes – some of which involve technology while others don’t.  Tools to be explored include lecture capture and clicker systems. If any other faculty are interested in innovative pedagogy, let Jeremy know.
  • Lecture capture.  A team of stakeholders (including TAG members Jeremy, Kristen, Sandy, and Eugeniu) met several times in the spring and summer to review possible products for lecture capture.  The final recommendation was a hybrid solution of Media Site (as a back end) and Crestron HD appliances for the actual capture. Implementation will start in the Science Center and then spread to other departments. Right now, IR is working on setting up the back end servers while VistaComm is implementing the front end capture devices. The goal is to have LSC lecture capture ready to go by Spring 2011, and then expand to other departments next year as funding allows. Sandy and Teresa noted that Education and Nursing would be very interested in implementing lecture capture in their classrooms. Thanks to Jason Oakey over in Instructional Technology for taking the lead on this project!
  • Office 2010.  The upgrade to Office 2010 for faculty and staff is tied to the email conversion (see below) due to the incorporation of Outlook.
  • Windows 7. The upgrade to Windows 7 for faculty and staff machines currently running Windows XP is held up due to a security issue. XP users are currently admin users on their computers. While this gives us a lot of flexibility and control over our own machines, it also introduces security risks – users can accidentally install malicious code.  When we move to Windows 7, IR will change XP users’ roles from admin to standard user accounts. By default, standard users wouldn’t be able to install or delete applications, but ideally there will be a way for users to obtain temporary admin status when they need to install programs. IR is currently working out these privilege management issues, so Windows 7 deployment is pushed back to (tentatively) Spring 2011.   Wesley asked about 64 bit vs 32 bit machines – Jim said that by default new machines will be 32 bit, but faculty who need 64 bit should let him know.
  • Email conversion. The Microsoft Live @ Edu email transition has been delayed by issues with identity management (e.g., automatically assigning set permissions to new hires, and removing permissions from retirees, departing employees, etc). IR is working on a workaround plan that would let us go forward with the email conversion while temporarily skipping over identity management. IR is aware of “crunch times” in faculty schedules, so faculty email conversion will probably wait until intersession or beyond.
  • Personally identifiable information.  Ben asked about security concerns for faculty members who don’t use University email.  Jim recommends that any University business, and especially any University business that involves confidential information, be done using University services (like Angel and Royal Drive). The Identity Finder tool is available to help faculty and staff find any PII that might be on their machines. IR also has security training videos that faculty can watch to get an entry-level awareness of PII.
  • Information Resources Advisory Committee.  IRAC had been inactive for a year but is now reconstituted. IRAC members will be providing input on IR’s service portfolio. TAG members Dave, Paul, Eugeniu, and Lori will be on it as CAS faculty, PCPS faculty, CTLE, and PR representatives, respectively.
  • TechQual. IR ran this customer service survey over the summer. Preliminary results just came in, but IR is still processing them and will present them to IRAC next month.
  • Loyola Science Center. Most of the IT work in LSC is done, but there are still a few equipment issues popping up in classrooms. IR will continue working on this. Remaining projects include lecture capture, the auditorium, and RoomView, a tool that will allow Instructional Technology to monitor and maintain classroom equipment (e.g., whether or not a projector has been left on).
  • Wireless. The wireless upgrade project was approved.  Phase I (freshmen residences, the new Mulberry Street residences, and the LSC) is complete and adds 350 new WiFi points to the campus. Phase II is currently underway and will add 252 WiFi points in 21 buildings (residences, St. Thomas, and the Long Center). Phase III is scheduled for summer 2012 and will include the remaining academic and administrative buildings as well as outdoor coverage.  This is a big improvement – many thanks to the Network Infrastructure staff!
  • CTLE liaison. CTLE used to have two faculty liaisons who focused teaching and pedagogy. They have now added a third faculty liaison, TAG member Sandy Pesavento, to provide input on faculty interests and needs regarding pedagogical uses of technology.
  • Mobile access to Angel. CTLE and IR experimented with Blackboard’s iOS app for Angel, but found it to be a very limited tool, particularly for teachers (e.g., faculty can’t enter grades or interact with Angel dropboxes).  So mobile access to Angel still isn’t conveniently available at this time.
  • LMS review. Our contract with Angel expires in 2013, so a review committee will begin exploring other learning management system (LMS) options in January. Connie Wisdo in ITDA will lead the group. Eugeniu said that we might have an opportunity to use a “free” installation of Blackboard temporarily (on top of our existing Angel installation) so that faculty could try it out. Dave asked whether or not we would be able to migrate courses from Angel into a new LMS. Eugeniu said that from our current version of Angel (7.4), we could export/import single courses into Blackboard, with some imperfections. If we upgraded to v8 of Angel, we’d be able to batch migrate courses. Blackboard would also complement our Royal Card and emergency notification systems, since they’re Blackboard products (Transact and Connect), but it might not be easily tied into Banner.
  • Academic Technology Plan. The Provost’s office has no updates on the Academic Technology Plan.
  • Mobile website and app. Lori shared some analytics to give us an idea of how the mobile website and mobile app are being used. The app has been downloaded 7,604 times (mostly by iOS rather than Android devices). An in-app poll asked about the user’s identity, and 57% of the poll-takers were current students, 28% were alumni, 10% were prospective students, with faculty, staff, and other community members making up only 6%.  New app modules include Admissions and the Library (live but still being tweaked), with an Alumni module on the way. An iPad version is also on the timeline for this year, and hopefully mobile authentication is on the horizon.  The m.scranton mobile site is getting plenty of traffic. The most commonly viewed mobile pages are the home page and the admissions and academics home pages. [Note: Stats on the mobile app are here (in PDF). Stats on the mobile site are here (also in PDF).] PR is also setting up automatic redirects from the full site to the mobile site for recognized mobile devices – right now, the only active redirect is from the full site home page to the m.scranton home page.
  • Faculty websites. We’ve figured out a good workflow for faculty websites with CTLE. Any faculty member who wants to create a new website in the CMS should contact Aileen McHale in the CTLE. The CTLE TechCons will set up the faculty member’s web space, and then can help him or her as needed with templates or other support.  Sandy and Anne Marie would like to encourage faculty members (and any other page admins) to keep their websites current.
  • Continuing education. TAG members interested in learning more about academic uses of technology should keep an eye out for continuing education opportunities, since funding may be available. Jeremy and Sandy will each attend a day of the EDUCAUSE conference, courtesy of the Provost’s office.  Anne Marie and a few representatives from IR will also attend. TAG members who do participate in continuing education are asked to report back and share conference highlights.
  • Computerized testing. Teresa reported on concerns from the Nursing department. Nursing licensing exams are all online, so the department uses computerized testing to help their students prepare for the licensing environment.  Nursing faculty have run into trouble finding places to conduct their computer tests – there isn’t enough space to accommodate large classes, and classrooms that do accommodate that many students have been booked for other courses.  An ideal solution would be a large “shared resource” lab (possibly run by CTLE/Library) that faculty could schedule for tests, with computers set up to restrict access to the testing environment. Anne Marie suggested that we look at how other schools have solved this problem. Teresa will get more details on Nursing needs. Jim asked if other departments have this need, and for what class sizes. Once we have more information, we can agree on a good solution and then seek funding.
  • Our next meeting will be October 27. TAG members are asked to keep collecting (specific!) feedback from other faculty members on technology concerns or issues, and we’ll keep sharing information here as projects continue.

——

Note: Updated 10/24/11 with PDF docs of mobile app and website statistics shared during the meeting.





Snapshot: How students are using the network

23 09 2011

To help TAG get an idea of how current students are using the internet on campus, Cal over in Network Infrastructure sent me some quick stats on student connections (from live snapshots taken at around 4:30pm on a weekday).

Student connections to the campus network:

Wireless: 2617
Wired: 181
Game consoles (wired): 103

OS/device breakdown of all of the students using wireless (from a slightly later snapshot):

Mac: 914
Windows: 1074
iPhone: 499
iPad: 54
iPod: 1
Linux: 67

No huge surprises here, but it’s interesting to see just how much our students rely on wireless – and it’s good to know that we have this kind of data available.

(Thanks, Cal!)





Two upcoming outages

10 08 2011

IR posted two notices about upcoming outages to the my.scranton portal:

There will be a brief internet outage on August 13, 2011 between 9:00 AM and 11:00 AM as maintenance is performed on internet infrastructure. Off campus resources will not be accessible from on campus. On campus resources will be unavailable from off campus. Please contact the Technology Support Center at 570-941-4357 with any questions.

and

Network Infrastructure will be performing system maintenance on the CNAC systems on August 15 2011, between 9:00 PM and 11:00 PM. No downtime for authenticated users on the wired network is expected.  Downtime for wireless users is expected to be less than 10 minutes. Users attempting to authenticate to the wired or wireless network via CNAC will be unable to do so during this 10 minute window.

 





Good news for iPad users

3 05 2011

Heads up if you’ve tried to use an iPad on campus wireless. Network Infrastructure passed along some good news this morning:

We have received feedback from a number of users regarding the frequency in which iPads have to authenticate to ROYALAIR and how this is causing issues accessing some services from their device. This behavior is due to the unique way in which the iPads manage their wireless connections in that the device disconnects from the wireless network when the device is in a sleep state. Due to a low heartbeat timer in Cisco NAC, the device is decertified from the network while in this sleep state. In order to prevent this from occurring, we have increased this timer to 8 hours so that a user only needs to authenticate once during business hours. Please continue to provide us with any feedback you may have regarding this or any other iPad network issue.

Thanks to Cal and the rest of Network Infrastructure for the fix!





IT Matters Spring 2011

5 04 2011

The latest edition of IT Matters came out today and is available for download.  A few faculty-relevant highlights:

  • Security Manager Tony Maszeroski explains what the Identity and Access Management (IAM) initiative is all about.  The IAM initiative is the reason behind a lot of the smaller changes you’ll see happening on campus – e.g., your R number becoming your user ID, etc.
  • University of Scranton faculty and staff can get serious discounts on Microsoft Software like Office 2010 and a Windows 7 upgrade if they need the software on their home computers for work-related purposes.  Check out http://www.journeyed.com/select/go/CAUSCRANTON for pricing – just know that you’ll have to fax or email a copy of your Royal ID in order to complete your order.
  • There will be some major outages this summer from 7/28/11 through 8/2/11 as we go through an Enterprise Resource Planning (ERP) upgrade to a new operating system.  More details when we get closer to the migration date.
  • Three rooms in the Unified Science Center will have lecture capture capability.  If you’re interested in lecture capture, let TAG know – we need your input!
  • Deployment of Microsoft Forefront as a replacement for McAfee continues.  All campus PCs should be switched over by the end of May.  All faculty should get two warning emails with instructions in the week before their computer is scheduled for Forefront deployment.
  • Should funding be secured, campus wireless will be upgraded within the next six to ten months, starting with the dorms and followed by academic and administrative spaces.

——–

Note: Post updated 4/5 at 3pm with a clarification on campus wireless from Network Infrastructure.





IT Matters Winter 2010 Issue

30 11 2010

The new issue of IR’s IT Matters newsletter is available in PDF format.

As in the last issue, many of the articles deal with issues we’ve already been discussing here on the TAG site, but there’s a few new items of interest:

  • See p. 1 for a note from VP Jerry DeSanto on the email transition.
  • P. 3 has a quick update from the Mobile Applications team about the upcoming University mobile app.
  • On p. 4, Jim Franceschelli reminds everyone that completed Microcomputer Budget Forms need to be in by December 13 — so faculty members need to get any requests to their department chairs ASAP!
  • Also on p. 4: Some notes about Microsoft Forefront, which will be replacing McAfee Anti-Virus.  IR is beginning deployment this December, and McAfee will be removed from University computers by May 2011 at the latest.
  • P. 6: The Computer Maintenance Center has set a goal of having all four computer technicians Apple Certified by the end of December 2010.  So far, two of the four (Glen and Karl) have passed their certification tests.
  • Standard user accounts are mentioned on p. 7, but no further details on what kinds of software we will and own’t be able to install on our own computers.
  • My.Scranton is being updated – there will be a brand new version out, with an “improved user interface,” around Fall 2011 (p. 9).
  • Vince Merkel explains thin clients on p. 11.
  • Gus Fernandez goes through the steps of how the Computer Security Incident Response Team responds to infected computers (p. 14).
  • Information Security Manager Tony Maszeroski has some pointers for us on phishing scams on p. 15.  This is a must-read for faculty — TAG has heard from IR that faculty members have fallen for phishing scams in the past.
  • On p. 16, Cal Krzywiec reports that the University is planning to increase our wireless coverage from 300 wireless access points to closer to 1000. Wahoo! And the wireless network will be upgraded to accommodate higher demand. Wahoo again!
  • There will be a new Employee Applications tab on my.scranton.