{"id":640,"date":"2018-05-03T15:27:11","date_gmt":"2018-05-03T19:27:11","guid":{"rendered":"http:\/\/sites.scranton.edu\/itmatters\/?p=640"},"modified":"2018-05-03T15:52:38","modified_gmt":"2018-05-03T19:52:38","slug":"it-forum-presentation-infrastructure-upgrades","status":"publish","type":"post","link":"https:\/\/sites.scranton.edu\/itmatters\/2018\/05\/03\/it-forum-presentation-infrastructure-upgrades\/","title":{"rendered":"IT Forum Recap: Infrastructure Upgrades"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-641 alignright\" src=\"http:\/\/sites.scranton.edu\/itmatters\/files\/2018\/05\/server-300x200.jpg\" alt=\"\" width=\"386\" height=\"257\" srcset=\"https:\/\/sites.scranton.edu\/itmatters\/files\/2018\/05\/server-300x200.jpg 300w, https:\/\/sites.scranton.edu\/itmatters\/files\/2018\/05\/server-768x511.jpg 768w, https:\/\/sites.scranton.edu\/itmatters\/files\/2018\/05\/server-1024x682.jpg 1024w, https:\/\/sites.scranton.edu\/itmatters\/files\/2018\/05\/server.jpg 1920w\" sizes=\"auto, (max-width: 386px) 100vw, 386px\" \/><\/p>\n<p>The Division of Information Technology will be upgrading the following key infrastructure items over the summer:<\/p>\n<ul id=\"_fLEmy7NC3ESP5t\">\n<li id=\"_fZlUBM5EnaDO0E\">Unified Computing System (UCS) Blade Servers &#8211;\u00a0<em>Target: mid-June to late July<\/em><\/li>\n<li id=\"_6HSgR4OnaFqzNh\">Campus Datacenter Network Switches &#8211;<em>Target: mid-June to mid-August<\/em><\/li>\n<li id=\"_RJ4kBRKd246epL\">Campus Network Aggregation Switches &#8211;\u00a0<em>Target: late-June to mid-August<\/em><\/li>\n<li id=\"_NuVVDOQn2kKCgd\">Pulse Secure VPN Service (aka Network Connect)<\/li>\n<\/ul>\n<p>These major initiatives will require large amounts of infrastructure time to complete, but minimal downtime is anticipated to network and server resources.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Division of Information Technology will be upgrading the following key infrastructure items over the summer: Unified Computing System (UCS) Blade Servers &#8211;\u00a0Target: mid-June to late July Campus Datacenter Network Switches &#8211;Target: mid-June to mid-August Campus Network Aggregation Switches &#8211;\u00a0Target: late-June to mid-August Pulse Secure VPN Service (aka Network Connect) These major initiatives will require [&hellip;]<\/p>\n","protected":false},"author":258,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[35],"tags":[],"class_list":["post-640","post","type-post","status-publish","format-standard","hentry","category-it-news"],"_links":{"self":[{"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/posts\/640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/users\/258"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/comments?post=640"}],"version-history":[{"count":2,"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/posts\/640\/revisions"}],"predecessor-version":[{"id":649,"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/posts\/640\/revisions\/649"}],"wp:attachment":[{"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/media?parent=640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/categories?post=640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.scranton.edu\/itmatters\/wp-json\/wp\/v2\/tags?post=640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}